معدات التعدين

Gold mining equipment & ore processing plants

Blue centrifugal gold concentrator for gravity recovery

Complete 1 to 50 tonne-per-hour processing plants and individual machines for gold and mineral producers across Africa, from crusher to concentrate.

Recovery starts with the right process.

Two plants with the same capacity can recover very different amounts of gold. The difference is usually the process: the wrong separation method for an ore leaves value in the tailings.

Ore processing turns mined rock into a concentrate ready for refining. The ore is crushed, ground to a fine powder, sorted by particle size and then separated, so the valuable mineral is kept and waste rock is removed. The separation method depends on how the mineral occurs in your ore.

We help you choose that method, then supply the full plant or the individual machines you are missing, sized from 1 to 50 tonnes per hour. Where needed, ore samples can be tested by the equipment manufacturer's laboratory before you commit.

Three separation processes

Select a process to see the plant layout and the machines in it.

Flotation separation

Finely ground ore is mixed with water and reagents. Air bubbles carry the valuable mineral particles to the surface as a froth, which is skimmed off and thickened into concentrate. Flotation is the main method for fine-grained and sulphide ores.

Suited to
Sulphide gold ores, copper, lead, zinc and silver ores, and fine-grained complex ores.

Equipment sequence

  1. Jaw crusher
  2. Ball mill
  3. Spiral classifier
  4. Mixer
  5. Flotation machine
  6. Concentrator
Diagram of a flotation plant: jaw crusher, ball mill, spiral classifier, mixer, flotation machine and concentrator

Equipment we supply

Individual machines, replacement units or a complete plant package.

Crushing & grinding

  • Jaw crushers, primary and secondary
  • Ball mills
  • Spiral classifiers
  • Feeders and hoppers

Separation

  • Flotation machines
  • Shaking tables and spiral chutes
  • Centrifugal gold concentrators
  • Magnetic separators

Plant support

  • Thickeners and agitation tanks
  • Belt conveyors and pumps
  • Diesel generators
  • Wear parts and spare liners
Freshly excavated red earth pond at a mineral processing site

From site preparation to commissioning.


A plant needs prepared ground, water, ponds and power. We time equipment delivery to your site works, then coordinate installation, commissioning and operator training with the manufacturer's engineers.

Site works

Freshly excavated pond with red earth walls at a processing site
Pond excavation during site preparation.
Excavated pond covered with striped lining sheets held by sandbags
Pond lining in progress.

Mining equipment questions

All mining FAQs

How do I choose between flotation, gravity and magnetic separation?

It depends on your ore. Gravity suits free and alluvial gold with coarse particles; flotation suits sulphide and fine-grained ores; magnetic separation suits iron ores. Many gold plants combine gravity and flotation. The best way to decide is to test an ore sample, which we can arrange through the manufacturer's laboratory. Compare the three processes.

What plant capacity can you supply?

Complete ore processing plants from 1 to 50 tonnes per hour, as well as single machines to extend or repair an existing plant.

Can I buy a single machine rather than a whole plant?

Yes. We supply individual jaw crushers, ball mills, classifiers, flotation machines, shaking tables, concentrators, magnetic separators, conveyors and generators, plus wear parts and spare liners.

Related services

Planning a plant or replacing a machine?

Send your ore type, target capacity and site location. We will recommend a process and quote the equipment.